Wednesday, March 4, 2009

Resuming Progress

There has been a slow trickle of progress so far this year. We completed the hurricane-strapping part of the process. This morning we passed (building) inspection.

Our zoning hearing was cancelled and the case closed (thank you thank you thank you).

The electrical is underway.

We hired Bella Glass to do the fixed-pane windows. They framed everything in Monday. Monday night Jimmy and I primed all the wood & trim. Tuesday they cut and installed the glass in the 8 fixed-pane windows. It looks great.

Red Cap Plumbing took care of three dripping faucets and capped the pipes that used to run into the side of the bandroom, then pulled all the nasty rusting pipes off the wall (except in one spot that we will have to break and patch).

We hired a carpenter to finish framing in the door. Once that is done, we can stucco the outside and paint.

Got a little more to do on the furring strips.

Things are getting done.

No comments: